Belt has become an important part of the whole production equipment. Advanced structure, adaptable, small resistance, long life, easy maintenance, protection devices is a significant feature of belt conveyor.
In the conveyor run, we should first confirm conveyor equipment, personnel, goods being transported are in a safe state intact; Second, check all moving parts of the normal no foreign body, check all electrical wiring is normal, normal to the belt conveyor into operation. Finally, check the supply voltage and the device does not exceed the difference between the rated voltage ± 5%.
Running operation
1 Close the main power switch, check the device power is being fed properly and the power indicator is lit. To normal after the next step.
2 Close the power switch on each loop, check whether it is normal. Under normal conditions of: device does not operate, belt conveyors running light is not on, inverter and other equipment, power indicator light, the inverter display panel shows the normal (no fault code is displayed).
3 In accordance with the process starts all electrical equipment in turn, starting on a normal electrical equipment (motors or other equipment has reached the normal speed, the normal state) and then the next one electrical device startup.
Belt conveyor operation, is transported goods must comply with the requirements of the design objects, to comply with belt conveyor design capabilities. Secondly, we must pay attention to all categories of personnel not touch the moving parts of the conveyor belt, non-professionals are not free to contact with electrical components, control buttons, etc.. Finally, in the belt can not run the inverter circuit after the class, such as the identification of maintenance needs, you must stop the inverter in case of operation, otherwise it may damage the drive.
Stop running belt, press the Stop button to stop all pending system only after cut off the mains.
![]() |
Timing belts |
Model selection
⑴ Conveying the weight of objects (including spreader weight), dimensions and hanging way;
⑵ Line length and complexity of the horizontal and vertical rotary bending segment segment number;
⑶ Conveyor environmental working conditions and work shifts;
⑷ Conveyor speed and productivity;
⑸ Special process requirements.
Powered by a power roller barrel roller assembly, aluminum side plates, sheets rack, rod, bearing, drive and chain components. No power roller by a non-powered roller barrel assembly, aluminum side plates, sheets rack, rod, bearing components. Powered rollers driven by a drive means traction chain, the power roller chain drive sprocket on the barrel rotation, thus conveying the work by the rotation. Unpowered roller sliding workpiece or by the person squeezing the workpiece, the roller in freely moving.
Debugging
Debugging belt conveyor steps:
⑴ Careful testing after installation of the equipment belt conveyor, to meet design requirements.
⑵ The reducer, moving parts corresponding filling oil.
⑶ Belt conveyor installation to meet the requirements of a single device for manual work test, and debug belt conveyors combine action to meet the requirements.
⑷ commissioning of the electrical part of the belt conveyor. Including the action of conventional electrical wiring and commissioning, the equipment with good performance, to meet the design features and status.
Chinabase Machinery is a group of manufacturing facilities, offering one-stop solution for mechanical power transmission products in China. We can supply a full-range of power transmissions products, such as chains,Transmission Chain, Lifting Chain,sprockets and plate wheels, pulleys, gearboxes, motors, couplings,Rotex Coupling, gears and racks. Our product range also covers locking assemblies (clamping elements/locking device), taper bushes, QD bushes, bolt-on hubs, torque limiters, shaft collars, motor bases and motor slides, chain detachers, chain guides, universal joint, rod ends and yokes.